Scope:

We were appointed by Canada Life to deliver a comprehensive CAT A refurbishment of two 10,000 sq ft vacant floorplates within No.2 Leeds City Office Park. Acting as Principal Contractor, the project included M&E upgrades, refurbishment and servicing of existing chilled beams, bespoke joinery, furniture installation, and enhancements to shared amenity spaces including toilets, a business lounge, and feature living wall.

Working with:

Canada Life

Programme:

22 weeks

Key Criteria:

• Principal Contractor delivery • M&E upgrades and chilled beam refurbishment • Creation of enhanced landlord amenity spaces • Bespoke joinery and furniture installation • Supporting the future marketing and letting of vacant office space • Delivering a high-quality, occupier-ready environment within an occupied business park setting

What the client said:

"FORMM were great to work with on the Leeds City Office Park project. Paul was a key part of that experience, taking a practical and collaborative approach throughout and always being responsive when things needed resolving. We were really pleased with the finished space and have since appointed FORMM on another project, which probably speaks for itself."

Collaboration and delivery

Working closely with Canada Life and the wider project team, we coordinated the refurbishment as Principal Contractor, managing all aspects of delivery from M&E works through to finishes, furniture and shared amenity spaces. A collaborative approach ensured the technical upgrades, architectural vision and commercial objectives were aligned, creating a market-ready environment designed to attract future occupiers.

The result

The refurbishment repositioned two vacant floors as attractive, occupier-ready workspaces, combining upgraded infrastructure, enhanced amenities and modern finishes to support future lettings and maximise the long-term value of the asset.